An Example of an Innovation Process in Numbers
s less than planned
The Customer
Airbus
Airbus is an international aircraft manufacturer. In the aircraft upgrade project discussed here, the projectâs development was at risk. The strategic importance of an innovative approach to the development process was recognized, but could not be implemented internally. At the same time, the upgrade was to be completed in a shorter timeframe.Â
Such projects involve numerous work steps, dependencies, and stakeholders. Project planning must take into account not only the progress of development but also the sequence of activities at various locations and how they interact. In a specific project, it is important to examine how the overall duration can be reduced without losing sight of the necessary steps and interfaces.
The Project
Example of an Innovation Process for an Aircraft Upgrade Using the BOLD Way Methodology
As part of the innovation process, KBC analyzed the project plan, including its work steps and dependencies. In a series of innovation workshops, the core processes were systematically scrutinized and redesigned. To this end, the team organized the existing workflow into a structured overview to highlight which activities took place in what order and where handoffs or wait times impacted the plan.Â
Next, the BOLD Way methodology was applied. It calls for not merely improving existing processes step by step, but rather systematically breaking them down and reassembling them. In this process, activities may be eliminated, duplicated, or moved to a different point in the process. This allowed us to assess whether individual steps were actually necessary, whether they could be organized differently, or whether they could be carried out at a more appropriate time.Â
An important part of the analysis was the interaction of activities across different locations. The team asked whether certain tasks could be performed at a different point in the process and which dependencies would be eliminated as a result. This brought into focus not only individual tasks, but also their sequence, handoffs, and logistical connections. The workshops revealed several opportunities for radical improvements in the planning and execution of the upgrade.
The result
Get an aircraft upgrade a year sooner
The systematic overhaul of the core processes improved the process by more than 33 percent. The project schedule, originally planned for three years, was shortened by one year. As a result, the revised schedule called for two yearsârather than the originally planned threeâuntil potential delivery. The project was successfully completed.Â
In this âexample of an innovation process,â progress was achieved by having the team review the process as a whole and consistently rearrange established steps. The BOLD methodology provided a structured framework for this: activities could be eliminated, duplicated, or shifted. In this way, the focus was not only on the duration of individual tasks but also on how they interacted and the transitions between them.Â
The results provided the manufacturer with a basis for planning the upgrade in a significantly shorter timeframe. At the same time, the revised schedule was presented to the airline client. The project reference states that the project was successfully completed. The available project information does not include specific figures on the cost savings achieved; therefore, no such figures are provided here.