{"id":8249,"date":"2024-01-31T08:55:30","date_gmt":"2024-01-31T07:55:30","guid":{"rendered":"https:\/\/kbc-consultants.com\/?p=8249"},"modified":"2025-02-13T15:57:05","modified_gmt":"2025-02-13T14:57:05","slug":"bottleneck-management-due-to-crisis-situations","status":"publish","type":"post","link":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/","title":{"rendered":"Bottleneck management due to crisis situations"},"content":{"rendered":"\n<p class=\"is-style-tagline\">Publication<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Bottleneck management due to crisis situations<\/strong><\/h1>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"527\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-1024x527.jpg\" alt=\"\" class=\"wp-image-8252\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-1024x527.jpg 1024w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-300x154.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\"><strong><strong>When supply is jeopardized by delivery bottlenecks<\/strong><\/strong><\/h2>\n\n\n\n<p>Manufacturing companies are continuously exposed to uninfluenceablen risks that can have an impact on their own supply situation. . This includes \u00a0global Handelsbeziehungen and thus complex, closely timed supply chains or politically induced challenges, such as crises and wars, blockades of important transport routes or transshipment points, as well as border controls and customs controls. If such a risk becomes an actual problem, there is a risk of supply disruptions, production interruptions or high competitive pressure due to a shortage of resources. In addition, high inventory and storage costs may become necessary to cover a volatilen deliverysituation\u00a0 and increasing customer dissatisfaction due to poor delivery reliability gerufen. . Frequently, eincreased Memployee dissatisfaction due to permanent work in reactive mode (task force) is also the result.<\/p>\n\n\n\n<p>In order to counteract these consequences in the event of a bottleneck , , fast and efficient management of the situation and the management of the associated challenges is necessary.<\/p>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\"><strong><strong>Challenges in congestion management<\/strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>In the case of bottleneck management, the rapid creation of transparency regarding the supply of production is crucial.<\/li>\n\n\n\n<li>The systems (ERP) at the companies , which are designed for regular use, are usually unable to map the actual supply situation.<\/li>\n\n\n\n<li>A reliable and up-to-date database is therefore the success factor for being able to react quickly to new bottlenecks every day.<\/li>\n\n\n\n<li>Suppliers generally have no information about the criticality of their customers&#8217; requirements and are faced with a conflict of interest between several buyers.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\"><strong>Realizing fast and effective results in the event of a bottleneck by setting up and operating a supply cockpit<\/strong><\/h2>\n\n\n\n<p>The following steps are necessary to implement a supply cockpit (dashboard):<\/p>\n\n\n\n<p><strong>Definition Objectives and derivation of data requirements<\/strong><\/p>\n\n\n\n<p>Before the actual dataprocurementung, the objectives to be pursued must be defined.Here introduce yourself u.a. the following questions: Which aggregations are necessary (part number vs. End product level)? Which value chain depth should be mapped? Which timeslicen shoulden be mapped (Kalender weeks, days, &#8230;)?<\/p>\n\n\n\n<p><strong>Procurement of usable data<\/strong><\/p>\n\n\n\n<p>The next step is to create transparency about the availablen and additionally requiredn data and systems. The data is validated and missing or implausible data ert.<\/p>\n\n\n\n<p><strong>Data preparation and modeling<\/strong><\/p>\n\n\n\n<p>This is followed by the data connection from heterogeneous sources and the introduction of potentially necessary aggregation levels such as timeslices and product level.<\/p>\n\n\n\n<p><strong>Dashboard and Metrics design<\/strong><\/p>\n\n\n\n<p>For the setup and operation of a supply cockpit for efficient control (program, delivery schedule, &#8230;) the data e.g.B. by filtering according to addressee-oriented criteria (markets, time slice, &#8230;).<\/p>\n\n\n\n<p><strong>Report and derivation of measures<\/strong><\/p>\n\n\n\n<p>The dashboard created is used and reported on at all hierarchical levels for reporting purposes to create transparency about the supply situation. In detail, a comparison of requirements and delivery capacities and quantities is carried out and components are prioritized with the involvement of the supplier.<\/p>\n\n\n\n<p><strong>Operationalization<\/strong><\/p>\n\n\n\n<p>In order to definethe processes and responsibilities wuring the bottleneck situation , it is advisable to visualizesieration using a process diagram. This can include work instructions, standards, templates, etc. help.<\/p>\n\n\n\n<h3 class=\"wp-block-heading is-style-h3\"><strong><strong>Success factors<\/strong><\/strong><\/h3>\n\n\n\n<p>In addition to the establishment of a supply cockpit , the consistency of the reporting system in the hierarchy and the support on site at the supplier \u00a0are crucial. Only in this way can effective and feasible measures be derived as quickly as possible from a holistic view of the situation. In the event of a crisis, cooperation and close coordination between customer and the supplier is key.<\/p>\n\n\n\n<div  class=\" f4-block-team-single-teaser-kbc alignfull is-layout-constrained type-large alignfull alignleft has-background has-tertiary-background-color\"   >\n\n    <div class=\"team-single__wrapper\">\n        <div class=\"block-media\">\n            <div class=\"team_member  align--left\"><div class=\"team_member__image\"><div class=\"f4_img--adaptive team-single-image\" ><div class=\"f4_img-container f4_img--mobile square\" ><img width=\"700\" height=\"700\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-700x700.png\" class=\"attachment-square size-square\" alt=\"Weibliche Person, braune mittellange Haare, braune Augen, l\u00e4chelnd, tr\u00e4gt eine wei\u00dfe Bluse und schwarze Hose, stehend mit beiden H\u00e4nden in den Hosentaschen\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-700x700.png 700w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-150x150.png 150w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-300x300.png 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/div><div class=\"f4_img-container f4_img--desktop square\" ><img width=\"700\" height=\"700\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-700x700.png\" class=\"attachment-square size-square\" alt=\"Weibliche Person, braune mittellange Haare, braune Augen, l\u00e4chelnd, tr\u00e4gt eine wei\u00dfe Bluse und schwarze Hose, stehend mit beiden H\u00e4nden in den Hosentaschen\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-700x700.png 700w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-150x150.png 150w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Larissa_Fahrmeier-300x300.png 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/div><\/div><\/div><div class=\"team_member__copy\"><div class=\"team_member__title\">Larissa Fahrmeier<\/div><div class=\"team_member__jobtitle\">Director<\/div><ul class=\"team_contact_links\"><li class=\"wp-block-button has-icon icon--email-default\"><a class=\"wp-block-button__link\" title=\"l.fahrmeier@kbc-consultants.com\" href=\"mailto:l.fahrmeier@kbc-consultants.com\" target=\"_blank\" rel=\"noreferrer\" itemprop=\"sameAs\"><\/a><\/li><li class=\"wp-block-button has-icon icon--phone-default\"><a class=\"wp-block-button__link\" title=\"+49 151 148 472 03\" href=\"tel:+4915114847203\" target=\"_blank\" rel=\"noreferrer\" itemprop=\"sameAs\"><\/a><\/li><\/ul><\/div><\/div>        <\/div>\n\n\n\n        <div class=\"block-inner\">\n            <div class=\"content-wrapper\">\n\n                <div class=\"acf-innerblocks-container\">\n\n<p class=\"is-style-tagline\">Need furhter information?<\/p>\n\n\n\n<p class=\"is-style-h3\">Your contact<\/p>\n\n<\/div>            <\/div>\n        <\/div>\n    <\/div>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>When supply is jeopardized by delivery bottlenecks<\/p>\n<p>Manufacturing companies are continuously exposed to uninfluenceablen risks that can have an impact on their own supply situation. . This includes \u00a0global Handelsbeziehungen and thus complex, closely timed supply chains or politically induced challenges, such as crises and wars, blockades of important transport routes or transshipment points, as well as border controls and customs controls. If such a risk becomes an actual problem, there is a risk of supply disruptions, production interruptions or high competitive pressure due to a shortage of resources. In addition, high inventory and storage costs may become necessary to cover a volatilen deliverysituation\u00a0 and increasing customer dissatisfaction due to poor delivery reliability gerufen. . Frequently, eincreased Memployee dissatisfaction due to permanent work in reactive mode (task force) is also the result.<\/p>\n<p>In order to counteract these consequences in the event of a bottleneck , , fast and efficient management of the situation and the management of the associated challenges is necessary.<\/p>\n<p>Challenges in congestion management<\/p>\n<p>In the case of bottleneck management, the rapid creation of transparency regarding the supply of production is crucial.<\/p>\n<p>The systems (ERP) at the companies , which are designed for regular use, are usually unable to map the actual supply situation.<\/p>\n<p>A reliable and up-to-date database is therefore the success factor for being able to react quickly to new bottlenecks every day.<\/p>\n<p>Suppliers generally have no information about the criticality of their customers&#8217; requirements and are faced with a conflict of interest between several buyers.<\/p>\n<p>Realizing fast and effective results in the event of a bottleneck by setting up and operating a supply cockpit<\/p>\n<p>The following steps are necessary to implement a supply cockpit (dashboard):<\/p>\n<p>Definition Objectives and derivation of data requirements<\/p>\n<p>Before the actual dataprocurementung, the objectives to be pursued must be defined.Here introduce yourself u.a. the following questions: Which aggregations are necessary (part number vs. End product level)? Which value chain depth should be mapped? Which timeslicen shoulden be mapped (Kalender weeks, days, &#8230;)?<\/p>\n<p>Procurement of usable data<\/p>\n<p>The next step is to create transparency about the availablen and additionally requiredn data and systems. The data is validated and missing or implausible data ert.<\/p>\n<p>Data preparation and modeling<\/p>\n<p>This is followed by the data connection from heterogeneous sources and the introduction of potentially necessary aggregation levels such as timeslices and product level.<\/p>\n<p>Dashboard and Metrics design<\/p>\n<p>For the setup and operation of a supply cockpit for efficient control (program, delivery schedule, &#8230;) the data e.g.B. by filtering according to addressee-oriented criteria (markets, time slice, &#8230;).<\/p>\n<p>Report and derivation of measures<\/p>\n<p>The dashboard created is used and reported on at all hierarchical levels for reporting purposes to create transparency about the supply situation. In detail, a comparison of requirements and delivery capacities and quantities is carried out and components are prioritized with the involvement of the supplier.<\/p>\n<p>Operationalization<\/p>\n<p>In order to definethe processes and responsibilities wuring the bottleneck situation , it is advisable to visualizesieration using a process diagram. This can include work instructions, standards, templates, etc. help.<\/p>\n<p>Success factors<\/p>\n<p>In addition to the establishment of a supply cockpit , the consistency of the reporting system in the hierarchy and the support on site at the supplier \u00a0are crucial. Only in this way can effective and feasible measures be derived as quickly as possible from a holistic view of the situation. In the event of a crisis, cooperation and close coordination between customer and the supplier is key.<\/p>\n<p>Need furhter information?<\/p>\n<p>Your contact<\/p>\n","protected":false},"author":9,"featured_media":8252,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[52],"tags":[],"f4_portfolio_taxonomy":[54],"class_list":["post-8249","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-publications"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bottleneck management due to crisis situations - KBC<\/title>\n<meta name=\"description\" content=\"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bottleneck management due to crisis situations - KBC\" \/>\n<meta property=\"og:description\" content=\"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\" \/>\n<meta property=\"og:site_name\" content=\"KBC\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-31T07:55:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-13T14:57:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1317\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nadine von Spl\u00e9nyi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nadine von Spl\u00e9nyi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\"},\"author\":{\"name\":\"Nadine von Spl\u00e9nyi\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/e0099252d4ea44fba6b919a19a8a098a\"},\"headline\":\"Bottleneck management due to crisis situations\",\"datePublished\":\"2024-01-31T07:55:30+00:00\",\"dateModified\":\"2025-02-13T14:57:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\"},\"wordCount\":586,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg\",\"articleSection\":[\"Publication\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\",\"url\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\",\"name\":\"Bottleneck management due to crisis situations - KBC\",\"isPartOf\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg\",\"datePublished\":\"2024-01-31T07:55:30+00:00\",\"dateModified\":\"2025-02-13T14:57:05+00:00\",\"description\":\"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.\",\"breadcrumb\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage\",\"url\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg\",\"contentUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg\",\"width\":2560,\"height\":1317,\"caption\":\"Ship's convoy passing through Suez Canal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/kbc-consultants.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bottleneck management due to crisis situations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#website\",\"url\":\"https:\/\/kbc-consultants.com\/en\/\",\"name\":\"KBC\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/kbc-consultants.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#organization\",\"name\":\"KBC\",\"url\":\"https:\/\/kbc-consultants.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg\",\"contentUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg\",\"width\":512,\"height\":512,\"caption\":\"KBC\"},\"image\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/e0099252d4ea44fba6b919a19a8a098a\",\"name\":\"Nadine von Spl\u00e9nyi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a38ea6484367411f1dd7a99c2eda6e1796eb0963e8e1d263fbe944f88b223d2f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a38ea6484367411f1dd7a99c2eda6e1796eb0963e8e1d263fbe944f88b223d2f?s=96&d=mm&r=g\",\"caption\":\"Nadine von Spl\u00e9nyi\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bottleneck management due to crisis situations - KBC","description":"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/","og_locale":"en_GB","og_type":"article","og_title":"Bottleneck management due to crisis situations - KBC","og_description":"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.","og_url":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/","og_site_name":"KBC","article_published_time":"2024-01-31T07:55:30+00:00","article_modified_time":"2025-02-13T14:57:05+00:00","og_image":[{"width":2560,"height":1317,"url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg","type":"image\/jpeg"}],"author":"Nadine von Spl\u00e9nyi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Nadine von Spl\u00e9nyi","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#article","isPartOf":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/"},"author":{"name":"Nadine von Spl\u00e9nyi","@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/e0099252d4ea44fba6b919a19a8a098a"},"headline":"Bottleneck management due to crisis situations","datePublished":"2024-01-31T07:55:30+00:00","dateModified":"2025-02-13T14:57:05+00:00","mainEntityOfPage":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/"},"wordCount":586,"commentCount":0,"publisher":{"@id":"https:\/\/kbc-consultants.com\/en\/#organization"},"image":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage"},"thumbnailUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg","articleSection":["Publication"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/","url":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/","name":"Bottleneck management due to crisis situations - KBC","isPartOf":{"@id":"https:\/\/kbc-consultants.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage"},"image":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage"},"thumbnailUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg","datePublished":"2024-01-31T07:55:30+00:00","dateModified":"2025-02-13T14:57:05+00:00","description":"Manufacturing companies are exposed to unpredictable risks that can lead to supply shortages and production disruptions. Efficient management is necessary.","breadcrumb":{"@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#primaryimage","url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg","contentUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2024\/01\/iStock-469758536-scaled.jpg","width":2560,"height":1317,"caption":"Ship's convoy passing through Suez Canal"},{"@type":"BreadcrumbList","@id":"https:\/\/kbc-consultants.com\/en\/bottleneck-management-due-to-crisis-situations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/kbc-consultants.com\/en\/"},{"@type":"ListItem","position":2,"name":"Bottleneck management due to crisis situations"}]},{"@type":"WebSite","@id":"https:\/\/kbc-consultants.com\/en\/#website","url":"https:\/\/kbc-consultants.com\/en\/","name":"KBC","description":"","publisher":{"@id":"https:\/\/kbc-consultants.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kbc-consultants.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/kbc-consultants.com\/en\/#organization","name":"KBC","url":"https:\/\/kbc-consultants.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg","contentUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg","width":512,"height":512,"caption":"KBC"},"image":{"@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/e0099252d4ea44fba6b919a19a8a098a","name":"Nadine von Spl\u00e9nyi","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a38ea6484367411f1dd7a99c2eda6e1796eb0963e8e1d263fbe944f88b223d2f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a38ea6484367411f1dd7a99c2eda6e1796eb0963e8e1d263fbe944f88b223d2f?s=96&d=mm&r=g","caption":"Nadine von Spl\u00e9nyi"}}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/posts\/8249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/comments?post=8249"}],"version-history":[{"count":2,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/posts\/8249\/revisions"}],"predecessor-version":[{"id":8493,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/posts\/8249\/revisions\/8493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/media\/8252"}],"wp:attachment":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/media?parent=8249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/categories?post=8249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/tags?post=8249"},{"taxonomy":"f4_portfolio_taxonomy","embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/f4_portfolio_taxonomy?post=8249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}