{"id":4870,"date":"2023-08-07T07:54:23","date_gmt":"2023-08-07T05:54:23","guid":{"rendered":"https:\/\/kbc-dev.flow4.one\/praxisbeispiele\/nachhaltige-reduzierung-von-qualitaetsbezogenen-kosten\/"},"modified":"2023-09-07T10:04:53","modified_gmt":"2023-09-07T08:04:53","slug":"sustainable-reduction-of-quality-related-costs","status":"publish","type":"f4_portfolio","link":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/","title":{"rendered":"Sustainable reduction of quality-related costs"},"content":{"rendered":"\n<p class=\"is-style-tagline\"><strong>Project Example<\/strong><\/p>\n\n\n\n<h1 class=\"wp-block-heading is-style-h1\">Sustainable reduction of quality-related costs<\/h1>\n\n\n\n<p class=\"is-style-p-large\">One major challenge in the implementation of initiatives to reduce quality-related costs is the need for continuous monitoring of the content, progress and impact of measures. As the benefits of quality measures are usually not apparent the moment the measures are implemented, but with a time delay, the results can usually only be measured at a later point in time. It is therefore all the more important to measure the success of the measures at an early stage, and then continuously, to ensure their long-term effect. This is why we define application, implementation and impact measurement variables the moment the measures are implemented.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-1024x682.jpg\" alt=\"\" class=\"wp-image-3020\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-1024x682.jpg 1024w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-300x200.jpg 300w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-252x168.jpg 252w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\"><strong>Background<\/strong><\/h2>\n\n\n\n<p>Our experience has shown that numerous companies do not consistently monitor their implemented measures. As a consequence, the expected success of the measures fails to materialise, and the planned quality cost targets remain unachieved.<br>Therefore, risks for the measures must be identified at an early stage and countermeasures must be taken as a consequence. In this context, we continuously accompanied an initiative to reduce quality-related costs for an automobile manufacturer from initialisation all the way to sustainable implementation of measures and ensuring the effectiveness of the measures.<\/p>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\"><strong>Specific assignment<\/strong><\/h2>\n\n\n\n<p>Efficient implementation support and ensuring that our client achieves the benefits of quality measures for sustainable process improvements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\">KBC Approach<\/h2>\n\n\n\n<p>KBC\u2019s long and comprehensive experience in process optimisation gives us the necessary expertise to ensure the long-term and sustainable success of our client\u2019s process improvements.<br>To continuously monitor the progress and effect of the improvement measures and to counteract deviations from targets at an early stage, we implement individual measurement catalogues for our clients so that the achievement of benefits can be assessed. We were therefore able to ascertain the progress of implementation, application and effect of the measures at regular intervals.<br>This also enabled us to identify risks to the achievement of our client\u2019s targets at the earliest possible stage and to promptly identify any required escalation. In the event of identified deviations, we worked with the persons responsible for the measures on the client side to develop possible countermeasures in order to achieve all targets as planned and therefore to counteract any failure to meet them.<br>Once the execution of all measures had been completed, we carried out a final benefit assessment. We then accompanied the formal handover of the measures to the line managers in order to ensure the long-term success of the initiative.<\/p>\n\n\n\n<h2 class=\"wp-block-heading is-style-h3\">Achieved Effect<\/h2>\n\n\n\n<p>We ensure that your projects and measures stay on track and that your targets are secured. With our expertise in process optimisation and our sound knowledge of the industry and technology, we ensure the success of your projects and measures, whereby not only the complete and timely implementation of the defined content plays a role. We also assess projects and measures on a content level, keep an eye on possible risks and external influencing factors and are therefore also able to formulate and implement well-founded improvement measures as required.<\/p>\n\n\n\n<div  class=\" f4-block-team-single-teaser-kbc alignfull is-layout-constrained type-large alignfull alignleft has-background has-tertiary-background-color\"   >\n\n    <div class=\"team-single__wrapper\">\n        <div class=\"block-media\">\n            <div class=\"team_member  align--left\"><div class=\"team_member__image\"><div class=\"f4_img--adaptive team-single-image\" ><div class=\"f4_img-container f4_img--mobile square\" ><img width=\"700\" height=\"700\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-700x700.png\" class=\"attachment-square size-square\" alt=\"M\u00e4nnliche Person, braune kurze Haare, braune Augen, l\u00e4chelnd mit Bart, tr\u00e4gt ein wei\u00dfes Hemd und einen dunkelblauen Anzug, stehend mit der linken Hand in der Hosentasche\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-700x700.png 700w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-150x150.png 150w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-300x300.png 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/div><div class=\"f4_img-container f4_img--desktop square\" ><img width=\"700\" height=\"700\" src=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-700x700.png\" class=\"attachment-square size-square\" alt=\"M\u00e4nnliche Person, braune kurze Haare, braune Augen, l\u00e4chelnd mit Bart, tr\u00e4gt ein wei\u00dfes Hemd und einen dunkelblauen Anzug, stehend mit der linken Hand in der Hosentasche\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-700x700.png 700w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-150x150.png 150w, https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/Benedikt_Budde_Expertise-1-300x300.png 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/div><\/div><\/div><div class=\"team_member__copy\"><div class=\"team_member__title\">Benedikt Budde<\/div><div class=\"team_member__jobtitle\">Partner<\/div><ul class=\"team_contact_links\"><li class=\"wp-block-button has-icon icon--email-default\"><a class=\"wp-block-button__link\" title=\"b.budde@kbc-consultants.com\" href=\"mailto:b.budde@kbc-consultants.com\" target=\"_blank\" rel=\"noreferrer\" itemprop=\"sameAs\"><\/a><\/li><li class=\"wp-block-button has-icon icon--phone-default\"><a class=\"wp-block-button__link\" title=\"+49 151 148 472 18\" href=\"tel:+4915114847218\" target=\"_blank\" rel=\"noreferrer\" itemprop=\"sameAs\"><\/a><\/li><\/ul><\/div><\/div>        <\/div>\n\n\n\n        <div class=\"block-inner\">\n            <div class=\"content-wrapper\">\n\n                <div class=\"acf-innerblocks-container\">\n\n<p>With our support, our client was able to successfully implement and ensure the sustainable achievement of more than 100 measures within the specified time frame.<\/p>\n\n<\/div>            <\/div>\n        <\/div>\n    <\/div>\n\n<\/div>\n\n\n","protected":false},"excerpt":{"rendered":"<p>One major challenge in the implementation of initiatives to reduce quality-related costs is the need for continuous monitoring of the content, progress and impact of measures. As the benefits of quality measures are usually not apparent the moment the measures are implemented, but with a time delay, the results can usually only be measured at a later point in time. It is therefore all the more important to measure the success of the measures at an early stage, and then continuously, to ensure their long-term effect. This is why we define application, implementation and impact measurement variables the moment the measures are implemented.<\/p>\n<p>Background<\/p>\n<p>Our experience has shown that numerous companies do not consistently monitor their implemented measures. As a consequence, the expected success of the measures fails to materialise, and the planned quality cost targets remain unachieved.Therefore, risks for the measures must be identified at an early stage and countermeasures must be taken as a consequence. In this context, we continuously accompanied an initiative to reduce quality-related costs for an automobile manufacturer from initialisation all the way to sustainable implementation of measures and ensuring the effectiveness of the measures.<\/p>\n<p>Specific assignment<\/p>\n<p>Efficient implementation support and ensuring that our client achieves the benefits of quality measures for sustainable process improvements.<\/p>\n<p>KBC Approach<\/p>\n<p>KBC\u2019s long and comprehensive experience in process optimisation gives us the necessary expertise to ensure the long-term and sustainable success of our client\u2019s process improvements.To continuously monitor the progress and effect of the improvement measures and to counteract deviations from targets at an early stage, we implement individual measurement catalogues for our clients so that the achievement of benefits can be assessed. We were therefore able to ascertain the progress of implementation, application and effect of the measures at regular intervals.This also enabled us to identify risks to the achievement of our client\u2019s targets at the earliest possible stage and to promptly identify any required escalation. In the event of identified deviations, we worked with the persons responsible for the measures on the client side to develop possible countermeasures in order to achieve all targets as planned and therefore to counteract any failure to meet them.Once the execution of all measures had been completed, we carried out a final benefit assessment. We then accompanied the formal handover of the measures to the line managers in order to ensure the long-term success of the initiative.<\/p>\n<p>Achieved Effect<\/p>\n<p>We ensure that your projects and measures stay on track and that your targets are secured. With our expertise in process optimisation and our sound knowledge of the industry and technology, we ensure the success of your projects and measures, whereby not only the complete and timely implementation of the defined content plays a role. We also assess projects and measures on a content level, keep an eye on possible risks and external influencing factors and are therefore also able to formulate and implement well-founded improvement measures as required.<\/p>\n<p>With our support, our client was able to successfully implement and ensure the sustainable achievement of more than 100 measures within the specified time frame.<\/p>\n<p>Praxisbeispiele<\/p>\n<p>Content Related Teaser Praxisbeispiele<\/p>\n<p>INSIGHTS<\/p>\n<p>&nbsp;<\/p>\n<p>Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore.<\/p>\n<p>Insights<\/p>\n<p>Werkshalle sticht Stilles K\u00e4mmerlein<\/p>\n","protected":false},"featured_media":3021,"template":"","f4_portfolio_taxonomy":[55],"class_list":["post-4870","f4_portfolio","type-f4_portfolio","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sustainable reduction of quality-related costs - KBC<\/title>\n<meta name=\"description\" content=\"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sustainable reduction of quality-related costs - KBC\" \/>\n<meta property=\"og:description\" content=\"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/\" \/>\n<meta property=\"og:site_name\" content=\"KBC\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-07T08:04:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-1024x682.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"682\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/\",\"url\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/\",\"name\":\"Sustainable reduction of quality-related costs - KBC\",\"isPartOf\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg\",\"datePublished\":\"2023-08-07T05:54:23+00:00\",\"dateModified\":\"2023-09-07T08:04:53+00:00\",\"description\":\"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.\",\"breadcrumb\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage\",\"url\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg\",\"contentUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg\",\"width\":5464,\"height\":3640,\"caption\":\"Aerial View of Overpass and City Traffic at Night \/ Shanghai, China\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/kbc-consultants.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sustainable reduction of quality-related costs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#website\",\"url\":\"https:\/\/kbc-consultants.com\/en\/\",\"name\":\"KBC\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/kbc-consultants.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#organization\",\"name\":\"KBC\",\"url\":\"https:\/\/kbc-consultants.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg\",\"contentUrl\":\"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg\",\"width\":512,\"height\":512,\"caption\":\"KBC\"},\"image\":{\"@id\":\"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sustainable reduction of quality-related costs - KBC","description":"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/","og_locale":"en_GB","og_type":"article","og_title":"Sustainable reduction of quality-related costs - KBC","og_description":"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.","og_url":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/","og_site_name":"KBC","article_modified_time":"2023-09-07T08:04:53+00:00","og_image":[{"width":1024,"height":682,"url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-1024x682.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/","url":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/","name":"Sustainable reduction of quality-related costs - KBC","isPartOf":{"@id":"https:\/\/kbc-consultants.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage"},"image":{"@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage"},"thumbnailUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg","datePublished":"2023-08-07T05:54:23+00:00","dateModified":"2023-09-07T08:04:53+00:00","description":"Through many years of experience, KBC has the necessary expertise to ensure the long-term and sustainable success of our client.","breadcrumb":{"@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#primaryimage","url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg","contentUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/08\/iStock-1357458717-scaled.jpg","width":5464,"height":3640,"caption":"Aerial View of Overpass and City Traffic at Night \/ Shanghai, China"},{"@type":"BreadcrumbList","@id":"https:\/\/kbc-consultants.com\/en\/project-examples\/sustainable-reduction-of-quality-related-costs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/kbc-consultants.com\/en\/"},{"@type":"ListItem","position":2,"name":"Sustainable reduction of quality-related costs"}]},{"@type":"WebSite","@id":"https:\/\/kbc-consultants.com\/en\/#website","url":"https:\/\/kbc-consultants.com\/en\/","name":"KBC","description":"","publisher":{"@id":"https:\/\/kbc-consultants.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kbc-consultants.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/kbc-consultants.com\/en\/#organization","name":"KBC","url":"https:\/\/kbc-consultants.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg","contentUrl":"https:\/\/kbc-consultants.com\/wp-content\/uploads\/2023\/09\/cropped-KBC_Bildmarke_pos.jpg","width":512,"height":512,"caption":"KBC"},"image":{"@id":"https:\/\/kbc-consultants.com\/en\/#\/schema\/logo\/image\/"}}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/f4_portfolio\/4870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/f4_portfolio"}],"about":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/types\/f4_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/media\/3021"}],"wp:attachment":[{"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/media?parent=4870"}],"wp:term":[{"taxonomy":"f4_portfolio_taxonomy","embeddable":true,"href":"https:\/\/kbc-consultants.com\/en\/wp-json\/wp\/v2\/f4_portfolio_taxonomy?post=4870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}